# [Making Critical Changes on Components in WOs for a Versioned Product](https://www.rklesolutions.com/blog/making-critical-changes-on-components-in-wos-for-a-versioned-product)

 Written by [RKL Team](https://www.rklesolutions.com/blog/author/rkl-team) | Jul 18, 2019 12:12:00 PM

Prior to V12, Sage X3 would **not allow you to add or exclude components** in a Work Order for a Version-managed Product. You could only make changes to a few fields, such as Scrap factor, Pick list and Requirement date fields.

Previously the process to accomplish this was to create a new bill of material version with the required changes and create a new work order, because the manufacturing process for version-managed products is normally tightly controlled.

This enhancement was made because: There are times when it is necessary to adjust the components on a work order for version managed products and the previous process was very cumbersome.

Now a user that has User **parameter ECCWOCOM set to Yes**, can make critical changes on components on work orders with version-managed products.

 

#### These changes include:

- Adding sub-assemblies (phantoms) and unexpected materials.
- Excluding/reactivating components
- Changing values on some fields – Required quantity, Operation number and Pick list code.

#### Other Enhancements include:

- The option to trace (parameter MFGREV = YES) critical changes (see below)
- The changes use the same work order statuses as work orders with non-versioned products
- You can only make the critical changes if **Routing WO Management = ‘Materials change’ or Change Materials and operations’**

#### Benefits:

- Saves time when a change is required
- May lead to increased productivity
- You can trace the changes
- Simplifies processes which can reduce costs

#### When the MFGREV parameter for Revision Management is set to YES:

- You will need to add a reason for each change
- The revise history for each critical changed will be recorded in the **MFGMATREV table** when the Work Order is saved.
- You can then review the revision history for each component line.

Now let’s try making a couple of these changes to a version managed Work Order.

Create a new Work Order for a version-managed product:

 Now let's add unexpected Material – BMS002  (You get the message below – just click on OK.)

Add the component.

In the action button on the new component line – **choose Revision History** – now you can see the change that was made.

Now let’s change a requirement qty from 1 to 2.

Look at line 11 – it has been changed from 1 to 2

You will get the message below, just click ok.

Again, if you click on the component line that you just changed and choose **Revision History**, you can see the changes you made.

Now you have seen how you can make changes to a Versioned Work Order.

## Read other Sage X3 blogs by Debbie:

**[Global Serial Number Enhancements](https://www.rklesolutions.com/blog/global-serial-numbers-enhancement)**

**[How to Delete a Validated Delivery in 4 Easy Steps](https://www.rklesolutions.com/blog/how-to-delete-a-validated-delivery)**

[View full post](https://www.rklesolutions.com/blog/making-critical-changes-on-components-in-wos-for-a-versioned-product)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "RKL Team"
  },
  "dateModified" : "2023-04-18T20:30:53.261Z",
  "datePublished" : "2019-07-18T12:12:00Z",
  "headline" : "Making Critical Changes on Components in WOs for a Versioned Product",
  "image" : {
    "@type" : "ImageObject",
    "height" : 533,
    "url" : "https://www.rklesolutions.com/hubfs/social-suggested-images/www.erpfocus.compictures5919show240x160StockSnap+RALDM02X8S-1.jpg",
    "width" : 800
  },
  "mainEntityOfPage" : "https://www.rklesolutions.com/blog/making-critical-changes-on-components-in-wos-for-a-versioned-product",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://www.rklesolutions.com/hubfs/RKL%20Logos/0001-5330483477089761811-1.png",
      "width" : 236.84212
    },
    "name" : "RKL eSolutions "
  }
}
```